§ 6-2. Sewage system permit required.  


Latest version.
  • No building permit for a new dwelling, commercial use, industrial use or any other use requiring a potable water supply shall be issued until a sewage system permit has been issued by the health director or his representative and, unless it is possible to connect to an approved public water supply system, a well has been installed in accordance with §§ 19-13-B51a through 19-13-B511 of the State Public Health Code. The well driller's completion report, attesting to the depth, capacity, and yield of the given well must be filed with the Town's Health Department.
Comp. Ords. 1983, pg. 87, 11-15-76